Able are nearing the completion of project at Autoglym, Letchworth for the design, fabrication and installation of 17 off 30,000 litre storage tanks. As well as the tanks, Able are also installing the fill and return pipework to and from each tank that includes trace heating, insulation and a pigging system for each line.